Aerosol Foam Sealant Standards are Under Development

Two proposed standards concerning properties of aerosol foam sealants are currently in development within ASTM International Committee C24 on Building Seals and Sealants. Both proposed standards-WK6156, Practice for Specimen Preparation for Determining Rate of Air Leakage for Aerosol Foam Sealant Insulating Materials and Other Joint Insulating Materials, and WK6328, Test Method for Determining the Post Expansion for Aerosol Foam Sealants-are under the jurisdiction of Subcommittee C24.61 on Aerosol Foam Sealants.



The purpose of WK6156 is to create a simplified means of measuring air permeance for aerosol foam sealants used in building construction to reduce energy-wasting air leakage in and out of the building envelope.


The purpose of WK6328 will be to provide uniform product label information to the consumer concerning the amount of post-cure expansion of an aerosol foam sealant to expect after initial dispensing. It is believed that users of aerosol foam find it helpful to know how much wet uncured foam is needed to fill a cavity when applying foam to gaps and joints in the building envelope because this knowledge allows users to reduce foam sealant waste while effectively reducing energy-wasting air leakage and the associated problems to the building envelope caused by unwanted air leakage.


Subcommittee C42.61 is actively seeking participation form anyone interested in the development of either WK6156 or WK6328.


For more information on either proposed new standard, go to www.astm.org, and enter the work item number into the search box on the home page.


For technical information, contact Robert Braun, Dow Chemical, Wilmington, Ill., at (815) 476-1131 or [email protected]. Committee C24 meets June 12-16, during the June Committee Week in Reno, Nev. For membership or meeting details, contact Scott Orthey, ASTM International, at (610) 832-9730 or [email protected].

Browse Similar Articles

You May Also Like

A leveler th.at is off center
As construction companies push to overcome staffing challenges that have led to many project delays, Arcoro has released new data that sheds light on the recruiting and retention strategies being used to
Dangerous from heat wave during working outside the building. Caucasian male construction worker resting and drinking water from bottle in a very hot day. Heat stroke health problem.
On August 30, 2024, OSHA’s proposed rule on heat injury and illness prevention in outdoor and indoor settings was published in the Federal Register, officially starting the comment period.
AWCI's Construction Dimensions cover

Renew or Subscribe Today!