Association of the Wall and Ceiling Industry Logo

A Sure Bet for Increased Productivity

Armstrong Ceiling Systems


In this Armstrong® Build It Better episode, we are onsite with Anning-Johnson of Chicago, whose team cut their production schedule from 4 to 2 weeks with SimpleSoffit Drywall Framing System, mitered drywall, and several other time-saving suspended drywall grid solutions. See how they optimized modular prefabrication to improve productivity and meet a very tight installation schedule.